Steel Grating How to Install
Pv:231
Grating with high strength, appearance, reduce investment, easy installation and so on. Is
a reasonable and economical, but also to meet the requirements to save
steel grid plate products, in all walks of life have been widely used. Here's to ensure the safety and quality of the premise, combined with
the actual situation, taking into account the construction schedule and
construction is convenient to talk about the steel grating installation
technical requirements and considerations.
1) According to the structure construction sequence and the actual
situation may be steel grating according to layout diagram No.
transportation to the site.
2) steel grating during installation should pay attention, if steel
grating once set aside in the beam, the gap should be adjusted and fixed
immediately in order to avoid the displacement of steel grating,
causing accidents.
3) Steel Grating position must elevation drawings, number laying. Condemnation, accurate positioning.
4) Steel Grating installation space is usually 10mm. Position steel grid plates and edges
Installation Notes
1, steel grid panel installation process in strict accordance with
the design specifications for installation, after laying should be
fixed immediately, may not wait until the next day, making a connection
construction, in order to prevent the stampede fall accidents.
2.
After each layer or a unit grid laid, should be to set aside hole,
hole, mouth closed temporarily, if necessary, should be laid beneath the
hanging safety nets, the use of cover should be fixed to prevent
slippage. Larger diameter hole in the erection of scaffolding around should be maintained, and set up warning signs to prevent a fall.
3, should be installed platform railings, handrails installed in
accordance with design requirements in place, be safe, and reliable.
4,
the lifeline must be set in accordance with the requirements to
participate in the installation of steel grating must send the correct
hanging belts.